Putrawiyanta, I. P., Lumbantoruan, P. S. and Pati Lewar, I. (2025) “PERHITUNGAN PRODUKTIVITAS ALAT GALI MUAT DAN ANGKUT SWAKELOLA DAN KONTRAKTOR DALAM PEMBONGKARAN OVERBURDEN DI PT. INTERNASIONAL PRIMA COAL: PERHITUNGAN PRODUKTIVITAS ALAT GALI MUAT DAN ANGKUT SWAKELOLA DAN KONTRAKTOR DALAM PEMBONGKARAN OVERBURDEN DI PT. INTERNASIONAL PRIMA COAL”, JURNAL TEKNIK PERTAMBANGAN, 25(2), pp. 84–89. doi: 10.36873/jtp.v25i2.21250.